佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: icy97

【ECONBHD 5253 交流专区】亿钢

  [复制链接]
发表于 15-8-2018 05:03 PM | 显示全部楼层
icy97 发表于 10-7-2018 12:06 AM
http://www.bursamalaysia.com/market/listed-companies/company-announcements/5848473


楼主你好~ 为什么最近的文字不可以 ''COPY ''了?    之前我用"谷歌"翻译 SYSTEM 拷贝文章来听,
原因我的视觉不好常时间看字体会造成眼睛头痛,

希望你大量用回之前的版本好吗?

谢谢谢你,  愿你健康愉快。。。




点评

你好,这是因为大多书报章网站已设置限制复制功能-南洋,星洲,中国报。。加上没有适用的插件plugin,所以无可奈何,只能使用载图而已。。东方网+the edge就没这限制  发表于 18-8-2018 03:12 AM
回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 17-8-2018 04:19 AM | 显示全部楼层
本帖最后由 icy97 于 17-8-2018 06:39 AM 编辑

Picture14.png

Type
Announcement
Subject
OTHERS
Description
Award of Contract for Sub-structure Works for Development at Lot 234, Jalan Kia Peng, Seksyen 63, Mukim Kuala Lumpur, Wilayah Persekutuan
The Board of Directors of Econpile Holdings Berhad (“Econpile”) is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. (“EMSB”) had on 15 August 2018, received a Letter of Award dated 8 August 2018 from Richmore Development Sdn. Bhd. to undertake piling and sub-structure works for development at Lot 234, Jalan Kia Peng, Seksyen 63, Mukim Kuala Lumpur, Wilayah Persekutuan (“Contract”).

Details of the full announcement is attached.

This announcement is dated 16 August 2018.


回复

使用道具 举报

发表于 19-8-2018 03:56 PM | 显示全部楼层
xian1976 发表于 15-8-2018 05:03 PM
楼主你好~ 为什么最近的文字不可以 ''COPY ''了?     之前我用"谷歌"翻译 SYSTEM 拷贝文章来听,
原因我的视觉不好常时间看字体会造成眼睛头痛,

希望你大量用回之前的版本好吗?

谢谢谢你,  愿你健康愉快 ...

  哦~ 原来这样,  那么好谢谢你 。
回复

使用道具 举报

 楼主| 发表于 31-8-2018 05:40 AM | 显示全部楼层
本帖最后由 icy97 于 4-9-2018 04:42 AM 编辑

亿钢控股获3410万金马士-新山铁路工程
theedgemarkets.com
August 29, 2018 19:40 pm +08

(吉隆坡29日讯)亿钢控股(Econpile Holdings Bhd)获杨忠礼机构(YTL Corp Bhd)子公司杨忠礼建筑私人有限公司(Syarikat Pembenaan Yeoh Tiong Lay)颁发总值3410万令吉的合约,承接金马士-新山电气化双轨铁路项目一部分的钻孔打桩及桩帽工程。

亿钢控股执行董事兼集团总执行长潘沙指出,加上最新这份合约,公司订单为13亿令吉,预计将在未来两三年确认。

该线路包括192公里的电气化双轨、车站、电动车站、陆地高架桥、桥梁、电气化及信号系统。

“亿钢控股将负责Section 3的工程,从巴罗(Paloh)至令金(Renggam)。”

该集团指出,合约期为4个月,预计在截至2019年6月30日止财政年为集团带来进账。

另外,亿钢控股公布,截至6月杪2018财政年第四季净利跌6.7%至1946万令吉,或每股1.46仙,去年同期报2086万令吉,或每股1.56仙,因大部分收入来自赚幅一般较低的基础设施项目。

然而,末季营业额从1亿5768万令吉,扬21.9%至1亿9228万令吉。

全年净利增7.8%至8710万令吉,相比2017财年的8077万令吉;营业额报7亿2840万令吉,比去年的5亿8191万令吉,按年弹升25.2%。

潘沙表示,亿钢控股未来将专注于提高效率,以加强净利增长。

“我们将在新财年继续保持审慎,并专注于更有效地优化我们的资源。过去两三年里,我们大量投资在机械,这足以满足进行中项目的广泛需求。”

他补充:“我们的目标是规划未来的可持续增长。”

(编译:陈慧珊)

Type
Announcement
Subject
OTHERS
Description
Award of Contract for Bored Piles Works for Electrified Double Track from Gemas to Johor Bahru - Section 3 - Bridges
The Board of Directors of Econpile Holdings Berhad (“Econpile”) is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. (“EMSB”) has on 28 August 2018, received a Letter of Award dated 7 August 2018 from Syarikat Pembenaan Yeoh Tiong Lay Sdn. Bhd. to undertake preliminary test pile work, bored piling and pile cap works for the Electrified Double Track from Gemas to Johor Bahru - Section 3 - Bridges ("Contract").

Details of the full announcement is attached.

This announcement is dated 29 August 2018.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/5899673

回复

使用道具 举报

 楼主| 发表于 31-8-2018 05:43 AM | 显示全部楼层
本帖最后由 icy97 于 3-9-2018 04:57 AM 编辑

Picture59.png

SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2018
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Jun 2018
30 Jun 2017
30 Jun 2018
30 Jun 2017
$$'000
$$'000
$$'000
$$'000
1Revenue
192,283
157,677
728,399
581,910
2Profit/(loss) before tax
26,798
28,461
114,463
111,620
3Profit/(loss) for the period
19,462
20,856
87,102
80,770
4Profit/(loss) attributable to ordinary equity holders of the parent
19,462
20,856
87,102
80,770
5Basic earnings/(loss) per share (Subunit)
1.46
1.56
6.51
6.04
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
2.50
4.50


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.2800
0.2300

回复

使用道具 举报

 楼主| 发表于 9-9-2018 07:03 AM | 显示全部楼层
Picture86.png
回复

使用道具 举报

Follow Us
 楼主| 发表于 25-12-2018 07:40 AM | 显示全部楼层
本帖最后由 icy97 于 6-1-2019 03:45 AM 编辑

亿钢首季净利挫29%
http://www.enanyang.my/news/20181127/亿钢首季净利挫29/

SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2018
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Sep 2018
30 Sep 2017
30 Sep 2018
30 Sep 2017
$$'000
$$'000
$$'000
$$'000
1Revenue
200,296
168,899
200,296
168,899
2Profit/(loss) before tax
20,445
29,129
20,445
29,129
3Profit/(loss) for the period
15,043
21,192
15,043
21,192
4Profit/(loss) attributable to ordinary equity holders of the parent
15,043
21,192
15,043
21,192
5Basic earnings/(loss) per share (Subunit)
1.12
1.58
1.12
1.58
6Proposed/Declared dividend per share (Subunit)
0.00
1.50
0.00
1.50


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.2900
0.2800

回复

使用道具 举报

 楼主| 发表于 21-2-2019 05:09 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Award of Contract for Basement and Sub-Structure Works for Proposed Pavilion Damansara Heights ("PDH") Parcel 2 Mixed Development at Jalan Damanlela, Mukim Kuala Lumpur, Daerah Kuala Lumpur, Wilayah Persekutuan
The Board of Directors of Econpile Holdings Berhad (“Econpile”) is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. (“EMSB”) has on 11 February 2019, received a Letter of Award dated 31 January 2019 from Domain Resources Sdn. Bhd. to undertake basement and sub-structure works for PDH (Parcel 2) mixed development at Jalan Damanlela, Mukim Kuala Lumpur, Daerah Kuala Lumpur, Wilayah Persekutuan ( the "Contract").

Details of the full announcement is attached.

This announcement is dated 12 February 2019.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6061577

回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 26-2-2019 05:15 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Dec 2018
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Dec 2018
31 Dec 2017
31 Dec 2018
31 Dec 2017
$$'000
$$'000
$$'000
$$'000
1Revenue
148,182
162,171
348,478
331,070
2Profit/(loss) before tax
-39,524
30,369
-19,079
59,498
3Profit/(loss) for the period
-34,447
22,731
-19,404
43,923
4Profit/(loss) attributable to ordinary equity holders of the parent
-34,447
22,731
-19,404
43,923
5Basic earnings/(loss) per share (Subunit)
-2.58
1.70
-1.45
3.28
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
1.50


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.2600
0.2800

回复

使用道具 举报

发表于 4-3-2019 02:11 AM | 显示全部楼层
Loading FB Video...

回复

使用道具 举报

 楼主| 发表于 20-3-2019 05:21 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Award of Contract for Piling, Pilecap and Basement Works for the Proposed Integrated Development which comprises Residential Towers, Podium Block, Retail Space, Serviced Apartments, Common Facilities, High Street, Facilities Block for Serviced Apartments, Facility Floor, Show Gallery, Event Hall, Promenade, Basement as well as Elevated Parking at Plot 8MD3, Precinct 8, Putrajaya
The Board of Directors of Econpile Holdings Berhad is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. has on 8 March 2019, received a Letter of Award dated 6 March 2019 from Niaz Enterprises (M) Sdn. Bhd. to undertake piling, pilecap and basement works for the proposed integrated development at Plot 8MD3, Precinct 8, Putrajaya.

Details of the full announcement is attached.

This announcement is dated 8 March 2019.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6090597

回复

使用道具 举报

 楼主| 发表于 3-4-2019 03:54 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Notice of Determination of Contract for Foundation and Substructure Works of a Mixed Development comprising of a 7-Block Serviced Apartments, Retail and Car Park at Lot 36190, Mukim Petaling, Kuala Lumpur ("Project")
The Board of Directors of Econpile Holdings Berhad wishes to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. has on 13 March 2019, issued a Notice of Determination to ASM Development (KL) Sdn Bhd (“ASM”), being the Employer of the Project. The Notice of Determination is based on the Notice of Default dated 25 February 2019 which was delivered to ASM, prior to the Notice of Determination.

Details of the full announcement is attached.

This announcement is dated 14 March 2019.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6095193

回复

使用道具 举报

 楼主| 发表于 5-4-2019 04:59 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Award of Contract for Reinforced Concrete Box Tunnel for the Proposed Construction and Completion of Hospital Kuala Lumpur Station Adit A Crossing Jalan Tun Razak at Jalan Tun Razak, Kuala Lumpur, Wilayah Persekutuan
The Board of Directors of Econpile Holdings Berhad is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. has on 19 March 2019, received a Sub-Contract Agreement from MMC Gamuda KVMRT (UGW) Joint Venture to undertake design, construction and completion of the reinforced concrete box tunnel works for the Proposed Construction and Completion of Hospital Kuala Lumpur Station Adit A Crossing Jalan Tun Razak, Kuala Lumpur, Wilayah Persekutuan under the Projek Mass Rapid Transit Laluan 2: Sungai Buloh – Serdang - Putrajaya.

Details of the full announcement is attached.

This announcement is dated 20 March 2019.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6100217

回复

使用道具 举报

 楼主| 发表于 30-6-2019 05:57 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Mar 2019
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Mar 2019
31 Mar 2018
31 Mar 2019
31 Mar 2018
$$'000
$$'000
$$'000
$$'000
1Revenue
138,260
205,046
486,738
536,116
2Profit/(loss) before tax
22,388
28,167
3,309
87,665
3Profit/(loss) for the period
21,745
23,717
2,341
67,640
4Profit/(loss) attributable to ordinary equity holders of the parent
21,745
23,717
2,341
67,640
5Basic earnings/(loss) per share (Subunit)
1.63
1.77
0.18
5.06
6Proposed/Declared dividend per share (Subunit)
0.00
1.00
0.00
2.50


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.2800
0.2800

回复

使用道具 举报

 楼主| 发表于 30-8-2019 04:09 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2019
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Jun 2019
30 Jun 2018
30 Jun 2019
30 Jun 2018
$$'000
$$'000
$$'000
$$'000
1Revenue
176,601
192,283
663,339
728,399
2Profit/(loss) before tax
29,461
26,798
32,770
114,463
3Profit/(loss) for the period
23,165
19,462
25,506
87,101
4Profit/(loss) attributable to ordinary equity holders of the parent
23,165
19,462
25,506
87,101
5Basic earnings/(loss) per share (Subunit)
1.73
1.46
1.91
6.51
6Proposed/Declared dividend per share (Subunit)
0.50
0.00
0.50
2.50


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.3000
0.2800

回复

使用道具 举报

 楼主| 发表于 2-10-2019 07:33 AM | 显示全部楼层
icy97 发表于 3-4-2019 03:54 AM
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6095193

Type
Announcement
Subject
OTHERS
Description
Notice of Determination of Contract for Foundation and Substructure Works of a Mixed Development comprising of a 7-Block Serviced Apartments, Retail and Car Park at Lot 36190, Mukim Petaling, Kuala Lumpur - Update
Reference is made to the Company’s announcements dated 14 March 2019 and 24 June 2019.

The Board of Directors of Econpile Holdings Berhad wishes to update that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. (“EMSB”) had on 17 September 2019 been awarded a sum of RM5,959,024.99 together with costs and interest, in relation to the award in the second Adjudication proceedings under the Construction Industry Payment & Adjudication Act 2012.

The first adjudication awarded to EMSB was on 21 June 2019 for a sum of RM67,767,269.32 together with costs.

The Arbitration filed by EMSB against ASM Development (KL) Sdn. Bhd. with Asian International Arbitration Centre is still in progress and any further material development of the above matter will be announced in due course.

This announcement is dated 20 September 2019.



回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 28-10-2019 05:00 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Award of Contract for Earthworks, Soil Nailing Works, Piling and Pilecap and Basement Lowest Floor Slab Works of a Proposed Commercial Development which comprises a commercial block with serviced apartments and SOHO, 7-storey podium block and retail space at GRN 321051 (Lot 72018), Jalan Persiaran Teknologi Subang, Taman Tropicana Metropark, Subang Jaya, Pekan Country Height, Daerah Petaling, Selangor Darul Ehsan
The Board of Directors of Econpile Holdings Berhad is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. has on 7 October 2019, received a Letter of Award dated 26 September 2019 from Tropicana Metropark Sdn. Bhd. to undertake earthworks, soil nailing works, piling and pilecap and basement lowest floor slab works for the proposed commercial development at GRN 321051 (Lot 72018), Jalan Persiaran Teknologi Subang, Taman Tropicana Metropark, Subang Jaya, Pekan Country Height, Daerah Petaling, Selangor Darul Ehsan.

Details of the full announcement is attached.

This announcement is dated 7 October 2019.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6303557

回复

使用道具 举报

 楼主| 发表于 9-11-2019 05:26 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Award of Contract for the Design, Supply and Installation of the Demolition, Earthwork, Piling and Substructure Works for the Phase 7 mixed development which comprises a 42-storey commercial block on a 11-storey podium block and basement car park, at Lot 52581, Mukim Sungai Buloh, Daerah Petaling, Jalan Persiaran Surian, Kota Damansara, PJU 3, Petaling Jaya, Selangor Darul Ehsan
The Board of Directors of Econpile Holdings Berhad is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. has on 17 October 2019, received a Letter of Award dated 11 October 2019 from Tropicana Indah Sdn. Bhd. to undertake demolition, earthwork, piling and substructure works for the Phase 7 mixed development at Lot 52581, Mukim Sungai Buloh, Daerah Petaling, Jalan Persiaran Surian, Kota Damansara, PJU 3, Petaling Jaya, Selangor Darul Ehsan.

Details of the full announcement is attached.

This announcement is dated 18 October 2019.
http://www.bursamalaysia.com/market/listed-companies/company-announcements/6316129

回复

使用道具 举报

 楼主| 发表于 16-11-2019 07:52 AM | 显示全部楼层
ECONPILE HOLDINGS BERHAD

EX-date
05 Dec 2019
Entitlement date
06 Dec 2019
Entitlement time
05:00 PM
Entitlement subject
First and Final Dividend
Entitlement description
First and Final Dividend of 0.5 sen per ordinary share
Period of interest payment
to
Financial Year End
30 Jun 2019
Share transfer book & register of members will be
to   closed from (both dates inclusive) for the purpose of determining the entitlement
Registrar or Service Provider name, address, telephone no
TRICOR INVESTOR & ISSUING HOUSE SERVICES SDN BHDUnit 32-01, Level 32, Tower A,Vertical Business Suite, Avenue 3, Bangsar South,No. 8, Jalan Kerinchi59200 Kuala LumpurTel:0327839299Fax:0327839222
Payment date
20 Dec 2019
a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers
06 Dec 2019
b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit

c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units) (If applicable)

Entitlement indicator
Currency
Currency
Malaysian Ringgit (MYR)
Entitlement in Currency
0.005

回复

使用道具 举报

 楼主| 发表于 24-1-2020 05:46 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Award of Contract for the Sub-structure and Basement Works for a property development project which comprises three residential blocks of 31 storeys, 33 storeys and 43 storeys respectively, one level of recreational facilities including a swimming pool, gymnasium, multipurpose hall and playground, a 6-storey podium carpark and a 3-storey basement carpark, at Lot PT 15212, Jalan Awan Besar, Mukim Petaling, Wilayah Persekutuan Kuala Lumpur.
The Board of Directors of Econpile Holdings Berhad is pleased to announce that its wholly-owned subsidiary, Econpile (M) Sdn. Bhd. has on 13 November 2019, received a Letter of Award dated 8 November 2019 from WCT OUG Development Sdn. Bhd. to undertake sub-structure and basement works for a property development project which comprises three residential blocks of 31 storeys, 33 storeys and 43 storeys respectively, one level of recreational facilities including a swimming pool, gymnasium, multipurpose hall and playground, a 6-storey podium carpark and a 3-storey basement carpark, at Lot PT 15212, Jalan Awan Besar, Mukim Petaling, Wilayah Persekutuan Kuala Lumpur.

Details of the full announcement is attached.

This announcement is dated 14 November 2019.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3001893

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 4-6-2024 06:48 AM , Processed in 0.074537 second(s), 29 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表