今天更低。。。Rm 0.705
回复

使用道具 举报


ADVERTISEMENT

发表于 23-12-2017 12:19 AM | 显示全部楼层
李文龙.沙布拉能源的惊吓

近期国际原油价格持续走稳,每桶企在60美元以上水平,令油气股暗暗喘口气,投资者也对油气股重燃一点信心。惟马股油气股老大沙布拉能源(SAPNRG,5218,主板贸服组)的第三季业绩却传来蒙受重亏的惊吓,粉碎投资者脆弱的信心。

沙布拉能源上周四午后宣布第三季业绩,市场没有料到竟然由盈转亏,而且亏得这么惨重,原本预料该公司仍可取得盈利,答案竟然是单季已净亏2亿7440万令吉,除了承担卖船亏损,核心建筑及钻油业务表现也比市场预期落差甚钜,令市场大吃一惊。

许多散户或公司股东的第一个反应,就是赶忙抛售股票,希望减少进一步亏损、避之则吉。

短期看来,抛售股票是正确的决定,因为该公司股价周五进一步深跌,接下来的股价表现也是欲振乏力,无望在较高水平退场的,惟有百般无奈。

该公司宣布业绩当天,半天交易的股价即重挫变为仙股,从1令吉21仙,崩跌24.5仙或20.24%至96.5仙。第二天跌势未止,再跌13.5仙或13.99%至83仙。这意味着在短短的一个半交易日里,股价崩跌38仙或31.4%,投资者也失血逾22亿令吉,肯定是难以忘怀的惨痛经验。

沙布拉能源业绩惊吓,显然是完全出乎市场预料之外,因为大多数分析员都预测,第三季及首9个月仍可取得盈利,如今晴天霹雳,马上惊醒许多“梦中人”,分析员不仅把全年净利预测大事扭转为净亏损,并且更为严重的是,更把接下来的两个财政年,也从净利转为大幅度净亏损,更是今次财报惊吓主要爆发点。

试想想看,若是市场预测沙布拉能源未来两三年将蒙受重亏,与之前净利预测拥有很大落差,股价马上惨跌三分之一并不为过。

沙布拉能源今次给予的教训,就是3年前爆发的全球油价崩跌危机所产生的后遗症尚未完全消逝,特别是营运性质为资金密集导向、及股价波动性剧烈的油气业,需要更多时日才能从危机中恢复元气,短期内尚是不容过于乐观。

影响油气业前景与表现的国内外因素错综复杂及难料,对投资者特别是“跟红顶白”的散户,有必要奉行谨慎投资态度,以免得不偿失而重创于股市沙场,甚至难以翻身。

文章来源:
星洲日报‧投资致富‧投资茶室‧文:李文龙‧2017.12.17
回复

使用道具 举报

发表于 31-12-2017 09:15 PM | 显示全部楼层
2017 从RM 1.62大跌至RM 0.71 (-56.17%)
回复

使用道具 举报

发表于 2-1-2018 03:37 PM | 显示全部楼层
没有最低只有更低!!!RM 0.665  
回复

使用道具 举报

发表于 3-1-2018 03:54 PM | 显示全部楼层
Tony-Pua 发表于 2-1-2018 03:37 PM
没有最低只有更低!!!RM 0.665

感觉今天好像来了!
回复

使用道具 举报

发表于 3-1-2018 07:37 PM | 显示全部楼层
墨士甲 发表于 3-1-2018 03:54 PM
感觉今天好像来了!

越看越入心。。。
回复

使用道具 举报

Follow Us
发表于 8-1-2018 10:03 PM | 显示全部楼层

RM0.975。。。。。。+0.165 +20%  
回复

使用道具 举报

发表于 17-1-2018 02:24 PM | 显示全部楼层
RM 0.80再排队。。。
回复

使用道具 举报


ADVERTISEMENT

发表于 21-1-2018 04:06 AM | 显示全部楼层
沙布拉能源套现资产‧石油探勘生产业务拟分拆上市

(吉隆坡19日讯)据称,随着油价回扬,沙布拉能源(SAPNRG,5218,主板贸服组)有意分拆石油探勘生产业务独立上市。

消息人士向《星报》披露,该公司正商讨上述计划,以套现部份资产。

沙布拉能源的主要业务包括石油探勘生产、工程建筑、钻油等。

国际油价过去几年下跌,导致该公司业务表现低迷,截至2017年10月31日第三季,该公司仅有石油探勘生产录得营运盈利。

该公司第三季营业额减少42%,至12亿7997万3000令吉,并由盈转亏,蒙受2亿7440万6000令吉,远逊前期的1亿5805万9000令吉盈利。

文章来源:
星洲日报/财经·2018.01.20
回复

使用道具 举报

发表于 23-1-2018 04:18 AM | 显示全部楼层
沙布拉能源
分拆能源估值高


2018年1月23日

分析:MIDF投资研究
目标价:1.01令吉

最新进展

消息称,基于油价回升,沙布拉能源(SAPNRG,5218 ,主板贸服股)考虑分拆能源业务独立上市,包括上游油气生产业务。

全球原油价格走坚,比2017年的平均水平上涨超过25%。

行家建议

比起隶属于集团旗下,若沙布拉能源将能源业务分拆出来,新臂膀能获更高估值。

参照本地和全球独立上游油气生产商,因全球原油价格触及每桶70美元,这些公司的估值,自去年12月起就已看涨超过10%。

同时,这激励投资者对本地油气股的兴趣,其中沙布拉能源在过去2个月的交易量激增(平均为1亿1000万股)。

该公司的能源业务,是所有业务中净利唯一稳定的领域。

一旦能源业务分拆成功,沙布拉能源将直接收益,因为这可从重估上游资产、预期产量及碳氢化合物较高平均售价中获得较高估值。

同时,分拆能更有效筹集和分配未来重型油田的资本支出和营运资本,分拆收益也可减轻集团现有债务。目前净负债水平为1.26倍。

因其他领域表现不佳,我们认为沙布拉能源的盈利能力可能持续疲软,但相信该股为投资者提供短期交易机会。



【e南洋】
回复

使用道具 举报

发表于 26-1-2018 04:12 AM | 显示全部楼层
本帖最后由 icy97 于 26-1-2018 07:09 AM 编辑

沙能源就勘探与生产臂膀潜在上市聘顾问
Neily Syafiqah/theedgemarkets.com
January 25, 2018 15:24 pm +08

(吉隆坡25日讯)综合油气业者沙布拉能源(Sapura Energy Bhd)表示,已聘请顾问对其勘探与生产(E&P)业务的潜在上市进行评估和提供咨询。

沙能源今日向大马交易所报备,本地媒体近期发表的文章暗示公司的勘探与生产业务上市,这将为公司套现资产提供一个平台。

“若有任何实质进展,公司将根据马交所主板上市条例,作出必要的公告。”

本地一家日报引述消息报道说,最近原油价格回升,促使沙能源考虑将勘探与生产臂膀上市,为套现部分资产的方式之一。

沙能源补充:“在这些业务中,勘探与生产是表现较好的部门。该业务在2014年中至去年第三季受到油气领域低迷的重创。”

该公司在截至去年10月杪2018财政年第三季净亏2亿7441万令吉,上财年同期则净赚1亿5806万令吉;营业额从22亿2000万令吉,跌42%至12亿8000万令吉。

综合2018财年首9个月的表现,该公司净亏2亿1795万令吉,相比同期的3亿8064万令吉净利;营业额由58亿4000万令吉,跌19%至47亿1000万令吉。

(编译:陈慧珊)

ype
Announcement
Subject
OTHERS
Description
COMPANY UPDATE
We refer to the recent articles with regards to the proposed listing of the E&P arm of Sapura Energy Berhad ("the Company").

These articles had alluded to the listing of the Company’s exploration and production (“E&P”) business which would, among others, provide an avenue for the Company to monetise its assets.

The Board of Directors (“Board”) and management of the Company would like to inform that the Company has engaged advisors to evaluate and advise on the potential listing of the E&P business.

The Company will make the necessary announcement in compliance with Bursa Malaysia Securities Berhad’s Main Market Listing Requirements should there be any material development on this matter.

This announcement is dated 25 January 2018.

回复

使用道具 举报

发表于 1-2-2018 03:13 PM 来自手机 | 显示全部楼层
30-Jan-2018        Insider        EMPLOYEES PROVIDENT FUND BOARD (a substantial shareholder) acquired 3,000,000 shares on 23-Jan-2018
(根据(30.01.2018)大马交易所的资料显示,雇员公积金局于(23.01.2018)在公开市场买入3,000,000股)
回复

使用道具 举报

发表于 1-2-2018 08:33 PM | 显示全部楼层
拜2买进。。。RM0.745 希望明天漲
回复

使用道具 举报

发表于 6-2-2018 02:23 AM | 显示全部楼层
本帖最后由 icy97 于 6-2-2018 05:23 AM 编辑

沙布拉能源赢9.05亿合约

2018年2月6日
(吉隆坡5日讯)沙布拉能源(SAPNRG,5218 ,主板贸服股)旗下子公司共获颁5项、总值约9.05亿令吉的合约。

沙布拉能源向交易所报备,这些合约分别是为国油勘探私人有限公司提供工程、采购、施工和调试(简称EPCC)合约,为期3年,合约将在2020年末季到期。

第二项合约则是为国油勘探提供小型EPCC服务,为期4年半,2022年次季截止。

此外,该公司也为登嘉楼岸外North Malay Basin的设施提供EPCC加装置合约,预计会在2020年次季竣工。

不仅如此,子公司也为臥哥(Bokor)中央处理平台(CPP)提供运输和装置工程,料在2020年3月完工。

最后一项合约则是为Fifth Oil Berth项目,提供陆地与岸外的管道和终站工程。项目预计在明年5月结束。

沙布拉能源相信这能贡献2018财年的净利,若合约获得延长,还能贡献未来净利。【e南洋】

Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD (FORMERLY KNOWN AS SAPURAKENCANA PETROLEUM BERHAD)- AWARD OF CONTRACTS
INTRODUCTION
The Board of Directors of Sapura Energy Berhad (formerly known as SapuraKencana Petroleum Berhad) ("Sapura Energy" or the “Company") (“Board”) is pleased to announce that its direct and indirect wholly-owned subsidiaries have been awarded contracts with a combined value of approximately RM905 million.
Details of each of these contracts (“Contracts”) are as summarised below :-

1. Provision of Engineering, Procurement, Construction and Commissioning (“EPCC”) of Kinarut ERB WEST Compressor Upgrading Project for PETRONAS Carigali Sdn. Bhd.
Sapura Fabrication Sdn. Bhd. (formerly known as SapuraKencana HL Sdn. Bhd.) has been awarded a contract to undertake the Provision of Engineering, Procurement, Construction and Commissioning (“EPCC”) of Kinarut ERB West Compressor Upgrading Project (“Contract”) for PETRONAS Carigali Sdn. Bhd.
The Contract work scope involves the removal of existing HP compressors and reinstallation of refurbished LP Compressors at EWDP-A, refurbishment of Reinjection Compressors to HP Compressors at offshore at EWG-A, replacement of compressors associated equipment, piping and instrumentation, process and utility tie-ins modifications and other related topside facilities brownfield modifications and improvement at ERB WEST platforms and Kinarut platforms.
The duration of the Contract will be for a three (3) years expiring in fourth quarter of 2020.

2. Provision of Minor Engineering, Procurement, Construction and Commissioning (“ePCC”) for Bokor Betty Brownfield & Rejuvenation for PETRONAS Carigali Sdn. Bhd.
Sapura Fabrication Sdn. Bhd. (formerly known as SapuraKencana HL Sdn. Bhd.) has been awarded a contract to undertake the Provision of Minor Engineering, Procurement, Construction and Commissioning (“ePCC”) for Bokor Betty Brownfield & Rejuvenation (“Contract”) for PETRONAS Carigali Sdn. Bhd.
The Contract scope of work comprises of Bokor rejuvenation and host tie-in works at existing platforms including LADR-A and BNG-B and Betty rejuvenation and redevelopment works involving existing platform facilities upgrades, both to support Bokor EOR and redevelopment of the two fields.
The duration of the Contract will be for a four and a half (4 ½) years expiring in second quarter of 2022.

3. Provision of Engineering, Procurement, Construction, Commissioning Plus Installation (“EPCC+I”) for FFD Phase 2 Facilities, North Malay Basin by Hess Exploration and Production Malaysia B.V.
Sapura Fabrication Sdn. Bhd. (formerly known as SapuraKencana HL Sdn. Bhd.) has been awarded a contract to undertake the Provision of Engineering, Procurement, Construction, Commissioning Plus Installation (“EPCC+I”) for FFD Phase 2 Facilities, North Malay Basin (“Contract”) for Hess Exploration And Production Malaysia B.V.
The Contract scope of work comprises engineering, procurement, construction and commissioning of a conventional 3-legged Terminal Wellhead Platform and a Minimal Wellhead Platform, with associated pipelines. The scope for offshore transportation and installation work associated to the above Contract is optional. Hess will notify Contractor in writing if this option is exercised.
The works are expected to be completed within second quarter of 2020.

4.   Provision of Transportation and Installation (“T&I”) Works for Bokor CPP Project by Malaysia Marine and Heavy Engineering Sdn. Bhd.
Sapura Offshore Sdn. Bhd. (formerly known as SapuraKencana TL Offshore Sdn. Bhd.) has been awarded a contract to undertake transportation and installation works for Bokor Central Processing Platform project (“Contract”) for Malaysia Marine and Heavy Engineering Sdn. Bhd.
The Contract scope of work comprises of transportation and installation of jackets, piles, bridges and appurtenances.
The works are expected to be completed by March 2020.

5.   Provision of Offshore/Onshore Pipeline and Terminal Works for Fifth Oil Berth Project by Mumbai Port Trust
Sapura Offshore Sdn. Bhd. (formerly known as SapuraKencana TL Offshore Sdn. Bhd.) has been awarded a contract to undertake the Provision of Offshore/Onshore Pipeline and Terminal Works for Fifth Oil Berth Project for Mumbai Port Trust.
The Contract scope of work comprises of installation of 42in diameter submarine pipeline with a 5in diameter composite cable between onshore terminal at Pir Pau (Main Land, Mumbai, India ) to the Terminal at Jawahar Dweep and its associated works including trenching, burial and on-shore civil works.
The works are expected to be completed by May 2019.

FINANCIAL EFFECTS
The Contracts announced herein will have no effect on the issued and paid-up share capital of the Company and are expected to contribute positively towards the earnings of Sapura Energy Group for the financial year ended 31 January 2018 and, for Contracts that extend beyond 31 January 2018, the financial period(s) thereafter within the duration of the Contracts and the extension periods if the extension options are exercised.

RISK FACTORS
Risk factors affecting the Contracts include execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions, and/or political, economic and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.

DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS
None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award and extension of the Contracts herein.

DIRECTORS’ STATEMENT
The Board is of the opinion that the acceptance of the Contracts herein is in the best interest of the Company.

This announcement is dated 5 February 2018.

回复

使用道具 举报

发表于 6-2-2018 11:46 AM | 显示全部楼层
好像在巴沙买菜哦。。。。RM 0.68
回复

使用道具 举报

发表于 6-2-2018 04:23 PM | 显示全部楼层
RM 0.73。。。。。
回复

使用道具 举报


ADVERTISEMENT

发表于 7-2-2018 06:07 AM | 显示全部楼层
本帖最后由 icy97 于 9-2-2018 06:45 AM 编辑


添新合约 估值吸引 沙布拉能源前景两极


財经 最后更新 2018年02月6日
(吉隆坡6日讯)大多投行相信,刚在週一(5日)宣布获得5份总值9亿零500万令吉合约的沙布拉能源(SAPNRG,5218,主板贸服股)当前估值具吸引力,其前景在油价回升的扶持下,值得期待,惟,亦有投行继续看淡该公司前景。

沙布拉能源今日与大市背道而驰,全天上涨1.5仙或2.13%,以72仙掛收,全天成交量为1亿5441万股,是全场第3大热门股。

肯纳格研究分析员指出,新合约在预料中,这也证明该公司有能力在竞爭激烈的市场,持续贏获合约。

「沙布拉能源並未透露个別合约的价值,我们认为,上述5项合约总值中的50%左右,来自国油勘探(PETRONAS Carigali)颁发的波科贝蒂已开发油田(Bokor Betty Brownfield)小型工程、採购、建设及启用(EPCC),还有修復工程合约,为期4年半。」

他补充道,包括上述波科贝蒂油田合约,沙布拉能源一共接获3项EPCC合约,以及2项运输与安装合约(T&I),合约期限由1年半到4年半不等,直至2023財政年(1月31日结账)。

E&P上市计划看好

此外,该分析员称,沙布拉能源分拆探索及生產业务(E&P)上市的计划虽然仍在初始阶段,但此举值得看好。

「通过分拆上市,沙布拉能源可利用旗下天然气田套现集资,同时,亦可减轻其负债压力,该公司截至2018財政年第3季的负债率为1.26倍。」

分析员表示,自从公布低於预期的第3季业绩后,沙布拉能源股价至今已滑落27%,相信所有利空已反映在股价上。

JF艾毕斯证券分析员亦开始看好沙布拉能源,认为该股下滑后,价值重新浮现。

同时,分析员指出,虽然获得5项新合约,但由於去年末季已完成17亿令吉订单,因此,沙布拉能源手上的订单总值估计由去年第3季的151亿令吉,降至140亿令吉。

无论如何,大眾投行分析员则因为,沙布拉能源近期可能需要作出减值拨备,加上风险溢价增高,因而对该股前景有所保留。

艾芬黄氏资本保持沙布拉能源「卖出」评级,目標价维持在73仙;而大眾投行將其评级降至「短线买进」,目標价则从1.69令吉,大幅降至1.11令吉。

看好沙布拉能源的肯纳格研究与JF艾毕斯分別將该股评级上修至「跑贏大市」和「买进」,目標价分別保持在82仙与1.06令吉。【东方网财经】



沙布拉能源
股价已反映利淡

2018年2月9日
http://www.enanyang.my/news/20180209/沙布拉能源br-股价已反映利淡/

回复

使用道具 举报

发表于 19-2-2018 12:38 PM | 显示全部楼层
早上买。。。。RM0.695, 希望开年发大財
回复

使用道具 举报

发表于 20-2-2018 01:47 AM | 显示全部楼层
沙布拉能源
钻井业务挑战大


2018年2月20日

分析:丰隆投行研究
目标价:67仙

最新进展:

沙布拉能源(SAPNRG,5218 ,主板贸服股)目前包括联营的工程与建筑订单达约160亿令吉,预计末季将确认12亿令吉。

工程与建筑现在的竞标订单为95亿美元,后期投标的有约50亿美元。

钻机使用率在第三季创33%新低,一旦SKD Alliance在4月开始新合约,料会获改善。

行家建议:

回顾沙布拉能源截至10月杪第三季业绩,净利由盈转亏,这主要因为工程和建筑疲弱,及钻机使用率走低。

工程与建筑订单中,由于有12亿令吉在末季确认,预计该业务在2018财年的营业额达约45亿令吉,按年持平。

钻井业务前景持续备受挑战,估计近期内不会有显著改善,因为钻机供应过多。

该公司在去年10月完成了B15气田的发展,将在末季开始产气。SK408气田的发展正如期进行,预计2020至2021年为Gorek和Larak提供首批气体。

我们认为,能源业务的潜在货币化,是近期的主要催化剂。

考虑到令吉走强、新增订单走低及钻机使用率预测减少,下调2018至2020财年净利预测。

该公司近期阻力依然存在,在维持营业额基础上仍有差距。

无论如何,该公司还是能直接从油价改善中受惠。维持评级,但下调目标价。



【e南洋】
回复

使用道具 举报

发表于 5-3-2018 11:15 PM | 显示全部楼层
RM0.60 , 明天rm0.58等你。。。
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 28-4-2024 01:58 PM , Processed in 0.117242 second(s), 22 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表