佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

查看: 1942|回复: 0

Floor maintenance methods

[复制链接]
发表于 11-3-2015 09:26 AM | 显示全部楼层 |阅读模式
本帖最后由 wangkiky 于 11-3-2015 09:28 AM 编辑

Floor maintenance methods
CAUTION: Never use a rubber mallet to tap planks, since this can mar or damage the fooring. Using the Mannington Spotnails Floor seven trust stapler, with the proper adapter attached (see stapler instructions for proper setup), continue to staple new planks every 6" to 8" on center, fastening the ends of the planks approximately 2" from each end. Using a pry bar, position the fnal fller planks. Face nail or tack each fnal plank into place with the pneumatic stapler. Install the molding and retain a few leftover planks in case a repair is ever required.wood plastic composite price in india Do not use manual nailers on any Mannington Hardwood Floors maple fooring or on any Tradewinds Collection. Bamboo fooring should not be stapled. Sweep foor to remove all dust and dirt. Take care not to scratch the fnish. FINAL INSPECTION After the foor is cleaned, inspect the foor for nicks, scratches, or any other imperfections that need attention. Touch up nicks and scratches with Mannington Hardwood Floors touch-up products.


The newly installed foor can accept foot traffc immediately.FLOOR PROTECTION DURING CONSTRUCTION Always protect the surface of installed fooring during construction by laying a quality felt paper over the foor and taping it to the baseboards. Never use plastic or polyethylene sheeting to cover the foor since they will trap moisture. The covering material must allow the foor to breathe. Glue-Down Installation Requirements & Procedures The Mannington glue-down system makes installation smooth and easy. Wood planks are glued to the subfoor using Mannington UltraSpread Mastic™ adhesive and a minimum 3⁄16" x 5⁄32" V-Notched trowel. This moisture-cured polyurethane adhesive forms a tenacious bond. wood plastic composite marketThe adhesive is VOC compliant, nonfammable, contains 0% water, and has a very mild odor. You may install Mannington engineered hardwood foors over concrete subfoors when you are using Mannington UltraSpread Mastic if the subfoor is visually dry and has no history of moisture problems.

NOTE: Do not install Mannington Hardwood Floors over perimeter-installed resilient fooring.This process is essential to achieve a random appearance. Start by either using random length planks found in the carton or by cutting four to fve planks in random lengths, differing by at least 6". When starting these frst few rows or courses, make certain to always measure from the tongue end of the plank when cutting. As you continue working across the foor be sure to maintain the 6" minimum between end joints on all adjacent rows.used vinyl fence for sale Randomly install different lengths to avoid a patterned appearance. Never waste materials; the ends cut from starter rows should be used at the opposite side of the room to complete rows or used to start the next row.http://www.wpcfloorforsale.com


回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 28-4-2024 06:07 AM , Processed in 0.061674 second(s), 28 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表